Water ingress through the roof at the Ark Centre, Basingstoke had resulted in damage to the suspended ceiling.
SCS visited the site and repaired the damaged area. It was a tricky task as the existing system was a concealed grid which means that individual areas are hard to remove as they interlock. The tiles used were Armstrong SL2 1500 x 300 tiles.