During half term, we completed a ceiling repair at Crescent School, Eastleigh.
The school hall ceiling had areas of Gyptone board, which had been damaged due to a burst pipe. The existing ceiling pattern was no longer available, so we repaired the damaged ceiling with sections of Gyptone board to match in. Once the ceiling is painted, the repair will be invisible.