After a few months on hold, we have recently finished installing a new MF ceiling to the sixth form common room at Seaford College, Petworth.
A laser level was used to install the new ceiling system at one flat level to conceal the dated vaulted ceiling. Fibreglass insulation was fitted above, along with energy efficient LED lights.
We plaster skimmed the new ceiling to give a smooth finish ready to be decorated. Two areas of 60m2 were completed in 3 days.