An ongoing job in Horsham for the SCS team - new warehouse units which required fire rated dividing walls. Twin studs with double layer of soundboard and insulation between were installed.
The new partitions have been machine taped ad jointed by the SCS team for a perfect finish. Rubbed down with an electric sander with in built dust extraction. The site foreman has been very impressed with our work and was full of praise.
A scissor lift was used on the job by our IPAF certificated installers.