Adapting a workspace to allow for a fluid and fast changing working environment needn’t be a headache.
At this busy Chichester based manufacturer, we cut a new opening in an existing wall and installed a new metal stud partition. A 1200mm wide ply door was installed next to a standard vision panel door to allow for large machinery to be relocated within the premises in the future.
As ever, the SCS force was on the case on a Saturday to avoid disruption to our client.